source subject to this subpart must achieve the following effluent limitations for the process operations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available (BPT): (a) Rolling spent neat oils–Subpart IBPT. There shall be no discharge of process wastewater pollutants. (b) Drawing spent lubricants—Subpart -BPT. There shall be no discharge of process wastewater pollutants. (c) Ertrusion spend emulsions-Subpart -BPT. There shall be no discharge of process wastewater pollutants. (d) Extrusion press hydraulic fluid leakage. (1) There shall be no discharge of process wastewater pollutants except as provided under paragraph (g)(2) of this section. (2) Process wastewater pollutants may be discharged, with no allowance for any pollutants discharged, provided the facility owner or operator demonstrates, on the basis of analytical methods set forth in or approved pursuant to 40 CFR part 136, that the concentrations of nitrosamine compounds in the wastewater discharged from the tube reducing process do not exceed 0.050 mg/l of N-nitrosodimethylamine, 0.020 mg/l of N-nitrosodiphenylamine, and 0.020 mg/l of N-nitrosodi-n-propylamine. (3) The demonstration required under subparagraph (g)(2) of this section shall be made once per month until the demonstration has been made for all three nitrosamine compounds for six consecutive months, after which time the demonstration may be made once per quarter. If a sample is found to contain any of the foregoing nitrosamine compounds at concentrations greater than those specified in subparagraph (g)(2) of this section, the actions described in paragraph (g)(4), of this section shall be taken, and the demonstration required under paragraph (g)(2) of this section shall be made once per month until it has been made for all three nitrosamine compounds for six consecutive months. (4) If sampling results show that any of the foregoing nitrosamine pounds is present in the process wastewater at concentrations greater than those specified in subparagraph (g)(2) of this section, the facility owner or operator shall ensure that, within thirty days of receiving written notification of the sampling results, there is no further discharge of tube reducing spent lubricant wastewater until the owner or operator: (i) Performs a subsequent analysis which demonstrates that the centrations of the foregoing nitrosamine compounds do not exceed the levels specified in paragraph (g)(2) of this section; or (ii) Substitutes a new tube reducing lubricant and thereafter complies with the requirements of paragraph (g)(3) of this section; or 1 Within the range of 7.5 to 10.0 at all times. (e) Swaging spent neat oils-Subpart E-BPT. There shall be no discharge of process wastewater pollutants. (f) Heat treatment contact cooling water. con (iii) Determines the source of the pollutant whose concentration exceeded the level specified in paragraph (g)(2) of this section and demonstrates to the satisfaction of the NPDES issuing authority that such source has been eliminated. (5) The concentration limits specified in paragraph (g)(2) of this section apply at the point of discharge from the tube reducing process. However, sampling after the tube reducing wastewater has been commingled with other wastewaters is permitted if: (i) Any dilution caused by the other wastewaters is taken into account in determining the appropriate (i.e., lower) allowable discharge concentration; and (ii) An analytical method of sufficient sensitivity is used to measure the levels of each of the foregoing nitrosamine compounds in the wastewaters being sampled. (h) Surface treatment spent baths. (i) Surface treatment rinse. SUBPART BPT mg/off-kg (pounds per million oft-pounds) of zirconium hafnium sawed or ground with emulsions 17.1 Within the range of 7.5 to 10.0 at all times. Chromium 3.91 Cyanide 2.58 Nickel Ammonia 1,190 Fluoride 529 Oil and grease 178 TSS 364 pH (1) Within the range of 7.5 to 10.0 at all times. 1.60 1.07 11.3 521 235 107 173 (") (m) Wet air pollution control scrubber blowdown-Subpart 1-BPT. There shall be no allowance for the discharge of process wastewater pollutants. 0.104 13.9 (b) Drawing spent lubricants—Subpart (3) The demonstration required under E-BAT. There shall be no discharge of paragraph (g)(2) of this section shall be process wastewater pollutants. made once per month until the dem(c) Extrusion spent emulsions-Subpart onstration has been made for all three E-BAT. There shall be no discharge of nitrosamine compounds for six conprocess wastewater pollutants. secutive months, after which time the (d) Extrusion press hydraulic fluid leak- demonstration may be made once per age. quarter. If a sample is found to contain any of the foregoing nitrosamine comSUBPART IBAT pounds at concentrations greater than Maximum for those specified in paragraph (g)(2) of Pollutant or pollutant property Maximum for monthly averany 1 day this section, the actions described in age paragraph (g)(4) of this section shall be mg/off-kg (pounds per million taken, and the demonstration required off-pounds of zirconium under paragraph (g)(2) of this section hafnium extruded shall be made once per month until it Chromium 0.043 has been made for all three nitrosaCyanide 0.069 0.029 mine compounds for six consecutive Nickel 0.455 0.301 Ammonia 31.6 months. Fluoride 14.1 6.26 (4) If sampling results show that any of the foregoing nitrosamine com(e) Swaging spent neat oils.—There pounds is present in the process wasteshall be no discharge of process waste water at concentrations greater than water pollutants. those specified in paragraph (g)(2) of (f) Heat treatment contact cooling this section, the facility owner or operwater. ator shall ensure that, within thirty SUBPART IBAT days of receiving written notification of the sampling results, there is no fur Maximum for ther discharge of tube reducing spent age lubricant wastewater until the owner or operator: (i) Performs a subsequent analysis hafnium heat treated which demonstrates that the con centrations of the foregoing nitrosaChromium 0.015 0.006 Cyanide mine compounds do not exceed the lev0.010 0.004 Nickel 0.066 0.044 els specified in paragraph (g)(2) of this Ammonia 2.01 section; or Fluoride 2.04 0.906 (ii) Substitutes a new tube reducing (8) Tube Reducing Spent Lubricant lubricant and thereafter complies with Subpart 1-BAT. the requirements of paragraph (g)(3) of (1) There shall be no discharge of this section; or process wastewater pollutants except (iii) Determines the source of the polas provided under paragraph (g)(2) of lutant whose concentration exceeded this section. the level specified in paragraph (g)(2) of (2) Process wastewater pollutants this section and demonstrates to the may be discharged, with no allowance satisfaction of the NPDES issuing aufor any pollutants discharged, provided thority that such source has been the facility owner or operator dem- eliminated. onstrates, on the basis of analytical (5) The concentration limits specified methods set forth in or approved pursu- in paragraph (g)(2) of this section apply ant to 40 CFR part 136, that the con- at the point of discharge from the tube centrations of nitrosamine compounds reducing process. However, sampling in the wastewater discharged from the after the tube reducing wastewater has tube reducing process do not exceed been commingled with other 0.050 mg/l of N-nitrosodimethylamine, wastewaters is permitted if: 0.020 mg/l of N-nitrosodiphenylamine, (i) Any dilution caused by the other and 0.020 mg/l of N-nitrosodi-n-propyl- wastewaters is taken into account in amine. determining the appropriate (i.e., 4.57 |